A Landmark Pilot for Public Housing Electrification
For the first time in the building’s 50+ year history, all residents now have access to integrated, year-round heating and cooling, a meaningful quality-of-life improvement for this elderly population.
The Carroll Tower pilot project represents a landmark deployment of window heat pump technology in public housing, carried out under Rhode Island’s Clean Heat Rhode Island (CHRI) program.
Managed by the Rhode Island Office of Energy Resources (OER) and administered by Abode Energy Management, this initiative replaced decades-old electric baseboard heating at Carroll Tower, a 15-story, 194-unit affordable housing building at 243 Smith Street, Providence, with Gradient All-Weather 120V™ window heat pumps.
The installation was completed in just 12 days with minimal disruption to residents, demonstrating that large-scale building electrification can be achieved efficiently and cost-effectively.
$1.2M
Total budget pilot investment
~60%
Estimated energy savings
12 days
Installation time building-wide
194 units
Low-income elderly residents & emergency shelter designation
Why Carroll Tower?
- Located in a federally designated disadvantaged community
- 194 apartments housing low-income elderly residents with electric baseboard heating
- Building infrastructure compatible with window-mounted plug-in heat pumps (no major electrical upgrades required)
- Non-profit/public ownership structure aligned with program equity objectives
- Designated emergency shelter, making climate resilience especially critical
Pilot Goals
- Demonstrate measurable energy cost savings for residents replacing electric resistance heating
- Validate improved comfort and potential health benefits from year-round climate control
- Prove viability for buildings that are difficult to retrofit with traditional HVAC systems
- Understand installer experience working with window heat pumps
- Track resident experience living with and operating window heat pumps
- Assess installation logistics, noise levels, and mechanical limitations in a multifamily setting
- Develop program recommendations for scaling to additional building
The Technology
Key Highlights
- Plugs into a standard 120V outlet
- Icon List Item
- Prove viability for buildings that are difficult to retrofit with traditional HVAC systems
Installation Approach
The installation of the equipment was done by Envr Air, a climate logistics company specializing in the deployment of heating and cooling equipment at scale. Their model is built around speed, coordination, and minimal disruption to residents and building operations.
For Carroll Tower, the crew was purpose-built for the scope of work: a Project Manager overseeing the full operation, two installation teams of two running simultaneously, a two-person assembly and runner team keeping equipment staged and ready. While one team is installing, equipment is already prepped and moving.
What made that possible was the preparation that happened well before installation day. Envr Air starts with a detailed site evaluation, identifying obstacles like elevator access and parking logistics. The team gets fully proficient with the specific equipment being deployed before work begins. Trial installations are completed on-site to validate the process in real conditions. From there, a full strategy is developed covering logistics, staging, and scheduling, then loaded into project management software. Stakeholders are informed of exactly what is happening and when, and the plan is adjusted in real time as conditions on the ground change. This structure is how 277 units got installed in a 15-story building in 12 days.
Energy Savings & Impact
The estimated annual cost savings of approximately $94,500 across 194 households equates to roughly $487 per apartment per year. This includes savings for the 105 apartments that previously had no air conditioning, for whom the heat pumps deliver a new net comfort benefit at lower annual energy cost than any alternative cooling system would have been required.
450,200 kWh
$94.5k
219 tons
Annual GHG Reduction (CO₂E)
~60%
Heating Energy Reduction
Partnership Structure
Lessons Learned & Considerations
Contracting Complexity
Resident Engagement
WiFi Cost Estimation
Speed of Deployment
For Complete Details
For more information
Kristin Dupre
VP Strategy and Partnerships
In the News
How a Rhode Island apartment building for seniors installed 277 heat pumps in just 12 days
Climate tech startup Gradient tells Fast Company exclusively how it retrofitted a Providence apartment building to slash emissions and save energy costs.